I read about the importance of the switching rules on a continuing stream of lots and have the following questions:ġ.Is it acceptable to select a specific plan (tightened, normal or reduced ) and use it without the switching rules?Ģ.Are there any exceptions which allow us to use a specific plan without applying the switching rules? We are planning to implement ANSI/ASQ Z1.4-2003(R2013) sampling inspection plan with our Finish products which are currently 100% inspected by QC Inspectors.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |